Doubly Fed Induction Generator in An Offshore Power Plant Operated at Rated V/HzDoubly Fed Induction Generator in An Offshore Power Plant Operated at Rated V/Hz
Title rated 0 out of 5 stars, based on 0 ratings(0 ratings)
Website or Online Data, 2012
Current format, Website or Online Data, 2012, , Available.
Website or Online Data, 2012
Current format, Website or Online Data, 2012, , Available. Offered in 0 more formats
This paper introduces the concept of constant Volt/Hz operation of offshore wind power plants. The deployment of offshore WPPs requires power transmission from the plant to the load center inland. Since this power transmission requires submarine cables, there is a need to use High-Voltage Direct Current transmission, which is economical for transmission distances longer than 50 kilometers. In the concept presented here, the onshore substation is operated at 60 Hz synced with the grid, and the offshore substation is operated at variable frequency and voltage, thus allowing the WPP to be operated at constant Volt/Hz.
From the community